Type of Work: Guardrail replacement and upgrades G5. Estimated Finish Date: November 2020, Utica Road, City of Sterling Heights Estimated Finish Date: October 2020, Hayes Road, City of Roseville and City of Warren Location: Mound Road to Bur Oak Drive Click Here to See Map January - March 2023 Estimated Cost: $1,725,000 Estimated Start Date: May 2022 After the construction, acceptance and release processes of a subdivision road, the road and the right-of-way is dedicated to the Macomb County Department of Roads. Estimated Finish Date: Fall 2022, Traffic Signals, Sterling Heights and Warren Estimated Cost: $2,300,000 To sign up for Traffic Incident alerts, click on Traffic. Location: Clinton Township, Harrison Township, Macomb Township, Shelby Township, and Washington Township Estimated Start Date: May 2020 . 2.5 Million Federal Grant Awarded to Innovate Mound Project. Estimated Finish Date: Fall 2022, Fiber Optic Network, Macomb County Estimated Start Date: September 2020 Estimated Finish Date: Summer 2023, Hayes Road, Clinton Township and Sterling Heights Type of Work: Bridge rehabilitation Location: East of Romeo Plank Road over the Middle Branch Clinton River Location: 10 locations Click here for more information. Location: West of 28 Mile Road over the East Branch Coon Creek Due to ongoing Mound Road construction, beginning Monday, February 20, the eastbound 12 Mile Rd. Estimated Finish Date: Fall 2022. * In known extreme weather events or accidents, the map provider may still show green lines, even if lanes or the entire road is closed. 117 South Groesbeck Highway, Mount Clemens, MI 48043, The Permit Department is closed from 12 p.m. 1 p.m. daily. Warren The long-awaited improvements to Macomb County's Mound Road are expected to conclude by the end of 2024, . Type of Work: Culvert replacement Estimated Cost: $265,000 Type of Work: Full Depth Concrete Replacement When submitting applications for commercial and utility permits, please mail or hand deliver four sets of plans with the application attached (see below) to: 117 South Groesbeck Highway, Mt. Macomb County Department of Roads (MDCR) said that all the dates below are estimates and could change. There is no cost to participate in this program. Location: SB I-75 ramp to I-94 M-3 (Gratiot) In Macomb County, southbound M-3 from 23 to 22 Mile Road will have one lane open, moving lane closures from 6 p.m.-5 a.m. nightly Monday-Wednesday. In Macomb County, eastbound and westbound Division Road at M-19/Main Street will have one lane open intermittently from 9 a.m.-3 p.m. Monday through late October. Estimated Finish Date: August 2020, Mound Road, City of Sterling Heights Unless otherwise noted, the information provided within innnovatemound.org is Copyright 2019 by Hoyden Creative Group. Type of Work: Large culvert replacement TheInnovate Moundproject will reconstruct approximately nine miles of Mound Road, strengthen the region and enhance connectivity by incorporating state-of-the-art design and smart technology to create a modern corridor. Contact the Maintenance Department at 586-792-6935 to reach the Service Centers. Estimated Finish Date: Fall 2022, 30 Mile Road, Washington Township MACOMB COUNTY, Mich. Officials have released a list of current and upcoming traffic projects in Macomb County. Type of Work: Culvert Replacement See the map for details. Type of Work: Rehabilitation Estimated Cost: $2,650,000 Location: Multiple locations Estimated Start Date: Summer 2022 Type of Work: Mill, Base Repair, Asphalt Overlay For the latest news from the Department of Roads, follow MCDR on Facebook and sign up to receive email and text alerts for construction and traffic updates at roads.macombgov.org. Location: NB M-10 Ramp to WB I-94 Estimated Cost: $519,000 #54/" _)"31\N4H Estimated Finish Date: November 2020, Dequindre Road, Shelby Township (Project with Road Commission for Oakland County) Location: North of Plumbrook Drain to 1,200 feet North of Clinton River median at Mound will be closed for thru traffic. UeN|}[V?KHgzu!&g\}V4(13l3 FC1_YRo|nI_Da=l u.M$i`,yFDx$ (WH?ajUzzQ>|H|&tz;/t?^{;A4["?efXZ'4&pShJg"l}K(*?MQb 7#^LkK=. Location: I-696 to M-59 Type of Work: Mill, base repair, and asphalt overlay Location: 14 Mile Road to Moravian Drive The first is on Gratiot . Type of Work: Deck Replacement You can also sign up to receive email and text alerts for construction and traffic updates at roads.macombgov.org. Location: Michigan Left at 15 Mile Road Lanes Blocked: Freeway Ramp, Right Shoulder There are two major projects coming that will impact drivers in Macomb County. Estimated Finish Date: Spring 2022, West Road, Washington Township Under the direction of the Macomb County Traffic Department, the TOC serves as the hub of activity for operation, maintenance and monitoring of the various countywide deployments of advanced traffic signal systems, cameras and overall Intelligent Transportation System (ITS) communications network. Type of Work: Mill, Base Repair, Asphalt Overlay This department facilitates the inspection of new subdivision road construction in all townships of Macomb County. Mound Road in Sterling Heights and Warren, 26 Mile Road Bridge in Macomb Township and Ray Township. Event Type: Disabled Vehicle, Cleared Crash on NB M-10 Type of Work: Installation and configuration of connected vehicle roadside units There are more than 4,400 miles of roads within Macomb County and MCDR is responsible for maintaining 1,773 miles of roadway in addition to more than 1,100 miles of subdivision streets. Estimated Finish Date: Fall 2022, Capac Road, Armada Township Estimated Finish Date: August 2021, 23 Mile Road, Shelby Township "We have a busy schedule planned with more than . Macomb County currently spends $3 to $4 million annually on maintenance and repairs. Traffic flow lines: Red lines = Heavy traffic flow, Yellow/Orange lines = Medium flow and Green = normal traffic or no traffic*. Location: EB M-8 at Woodward The total cost of the project is valued at $217 million, with local funding paving. tH@#tLO$8u9rqAP>o;0Xh:=^vaE Pq&Kuu` Estimated Finish Date: August 2020, 21 Mile Road, Shelby Township Type of Work: Installation of 16 miles of underground fiber optic cable along six corridors Estimated Cost: $1,326,000 Road construction in Macomb County: Timelines, traffic impact and more Macomb County officials release list of current, upcoming traffic projects MACOMB COUNTY, Mich. - Officials have. Estimated Cost: $86,000,000 Estimated Cost: $3,720,000 Location: 186 traffic signal locations Type of Work: New mast arm traffic signal with pedestrian crossing Location: South of 23 Mile Road over the Salt River Location: 14 traffic signal locations The road is 30 years old, which surpasses the average roadway expectancy of 25 years. Estimated Cost: $2,875,000 If you would like to subscribe for text alerts please select Text Updates in the drop-down menu. Estimated Cost: $6,555,000 Type of Work: Mill, Base Repair, Asphalt Overlay To submit an application, please select one of the following permits below: Permit inspectors review residential and commercial work performed under permit through the Department of Roads to ensure that required specifications are met. Estimated Start Date: May 2020 Estimated Start Date: June 2020 Estimated Finish Date: Fall 2022, Concrete Pavement Preservation Program, Macomb County To sign up for email updates from Macomb County or to access your subscriber preferences, please enter your email address. Estimated Finish Date: June 2020, 18 Mile Road, City of Sterling Heights The estimated construction cost for each project includes preliminary engineering to generate design drawings and bid documents, construction engineering and project oversight to maintain a high level of quality control, actual construction costs of materials, labor, and equipment required to build or repair infrastructure. The Innovate Mound project will reconstruct approximately nine miles of Mound Road between I-696 and M-59. To ask a question or submit a service request for maintenance on roads or traffic signals, click here to fill out the assistance form. Estimated Start Date: May 2020 Location: Shelby Road to Mound Road Estimated Start Date: June 2020 This is not an official Macomb County Department of Roads website. This includes issuing permits for trucking, construction, industrial developments, utilities, and residential issues. Macomb County, in partnership with the cities of Sterling Heights and Warren, will reconstruct approximately nine miles of the Mound Road corridor. Official Michigan DOT Road Conditions site. I want to credit the efforts of our team at the Department of Roads," said Macomb County Executive Mark A. Hackel. Roads - Maps | Macomb County. All existing public utilities must be included in the plans or project proposal. Estimated Start Date: May 2020 Macomb, MI Report, Forecast or Traffic Update: 2008-2023 LocalConditions.com. This is not an official Macomb County Department of Roads website. Type of Work: Repairs on various roads within the county Location: Gratiot Avenue (M-3) to Harper Avenue 26 MILE ROAD BRIDGE Road construction in Macomb County: Timelines, traffic impact and more Officials have released a list of current and upcoming traffic projects in Macomb County. Lanes Blocked: Left Lane, Center Lane 117 South Groesbeck Highway, Mount Clemens, MI 48043. Type of Work: Preventative maintenance Estimated Start Date: Spring 2022 Estimated Start Date: Summer 2022 GIS stands for Geographic Information Systems and is a powerful tool to manage data, especially spatial data. Type of Work: Mitigation and Safety Measure Location: 22 Mile Road to 23 Mile Road Estimated Finish Date: September 2020, Subdivision Reconstruction Program, Macomb County "From local roads to major corridors, the Department of Roads is . Portable message boards will detour traffic to use M-3 (Gratiot Avenue). This department facilitates the inspection of new subdivision road construction in all townships of Macomb County. Unless otherwise noted, the information provided within innnovatemound.org is Copyright 2019 by Hoyden Creative Group. Inspection notification and scheduling will not be valid via voicemail. Transportation permits will utilize Oxcart Permit Systems to manage and process permits online. To sign up for email updates from Macomb County or to access your subscriber preferences, please enter your email address. Estimated Cost: $1,575,000 HARRISON TOWNSHIP, Mich. - Road work and utility work require lane closures and a complete closure of I-94 this weekend in Macomb County. Estimated Finish Date: Summer 2022, Wolcott Road, Armada Township Estimated Cost: $1,611,685 Cleared Disabled Vehicle on EB I-94 Residents and businesses requiring immediate assistance can contact the construction ombudsman at 1-855-MOUND-4U (1-855-668-6348). 117 South Groesbeck Hwy., Mount Clemens, MI, 48043, General Media Inquires - please contact John Cwikla at 586-463-3523. We will continue to advocate for additional structural funding from our state and federal partners to ensure the more than $2 billion dollars in road improvements needed across Macomb County are resolved.". The Macomb County Department of Roads (MCDR) is the road agency in Macomb County. Click here to view the Weight Restriction Bulletin. Estimated Cost: $629,000 . See the map below for Service Center coverage areas. Estimated Finish Date: October 2020. Estimated Finish Date: Fall 2022, Metropolitan Parkway (16 Mile Road), Sterling Heights A shovel ready design will be ready in 2020 and initiate the bid process. Location: East of Heydenreich Road to Card Road Estimated Start Date: July 2020 MCDR maintains more than 1,700 miles of road with over 900 traffic signals and 60,000 signs. Click an incident icon on the map to get more information. Romeo Plank Road in Macomb Township will be widened from two to five lanes likely in 2023, following approval of a key chunk of the project by a pair of Macomb County Board of Commissioners. For lane closures and construction updates, click on Macomb Work Zone. Estimated Start Date: July 2022 117 South Groesbeck Hwy., Mount Clemens, MI, 48043, General Media Inquires - please contact John Cwikla at 586-463-3523, 117 South Groesbeck Highway, Mount Clemens, MI 48043, Reconstructed eight lane miles of primary and local roads, Resurfaced and rehabilitated 74 lane miles of primary and local roads, Replaced 33,000-square-yards of concrete pavement, Replaced critical road drainage infrastructure, Installed nearly 50 miles of sinusoidal rumble strips, known as mumble strips, on two-lane roads to reduce head-on crashes and limit noise pollution. Executive Committee for Grant Procurement, Open During Construction Communications Kit, Watch the construction presentation and download materials, The Innovate Mound project will reconstruct approximately nine miles of Mound Road between I-696 and M-59. Type of Work: Intersection Mound Road is in need of reconstruction so it will look and feel like the state-of-the-art technology corridor that it is. Macomb County currently spends $3 to $4 million annually on maintenance and repairs. Estimated Finish Date: September 2020, 21 Mile Road, Macomb Township Type of Work: New paint for stop bars, crosswalks and special markings median at Mound will be closed for thru traffic. How to use the Macomb Traffic Map Macomb County traffic updates reporting highway and road conditions with live interactive map including flow, delays, accidents, construction, closures,traffic jams and congestion, driving conditions, text alerts, gridlock, and driving conditions for the Macomb County area. Location: Multiple locations Type of Work: Extension, New Two-Lane Roadway Location: EB M-8 at Woodward, Disabled Vehicle on EB I-94 Black lines or No traffic flow lines could indicate a closed road, but in most cases it means that either there is not enough vehicle flow to register or traffic isn't monitored. Estimated Start Date: Spring 2022 Type of Work: Repairs on various roads within the county Estimated Start Date: June 2020 All rights reserved. This website and its contents may not be copied in part or full without express permission from Hoyden Creative Group. The project will incorporate innovations that will strengthen the region and enhance connectivity by incorporating state-of-the-art design and smart technology to create a modern corridor. Estimated Start Date: August 2020 All residential permitting must contact the Permit Department staff directly. Estimated Finish Date: June 2020, Cass Avenue, Clinton Township Type of Work: Mill, Base Repair, Asphalt Overlay Type of Work: Mill, Base Repair, Asphalt Overlay Estimated Cost: Work is part of the MDOT Bridge Bundle Program M-85 (Fort Street) In Wayne. The Department of Roads provides trash bags and safety vests to all organizations and participants. Type of Work: Mill, base repair, and asphalt overlay @i94Detroit Customers must speak directly to Permit Department staff to ensure accuracy of the permit and to determine the impact to Macomb Countys road system. Estimated Finish Date: Summer 2022, Garfield Road, Macomb Township Estimated Cost: $1,380,000 After the construction, acceptance and release processes of a subdivision road, the road and the right-of-way is dedicated to the Macomb County Department of Roads. Estimated Cost: Work is part of the MDOT Bridge Bundle Program Vision. Location: Multiple locations Estimated Finish Date: Fall 2022, Subdivision Reconstruction Program, Macomb County Estimated Start Date: Summer 2022 @DTWeetin, Cleared Crash on EB M-8 For more information, go to http://www.macombgov.org/adoptaroad-home, 117 South Groesbeck Highway, Mount Clemens, MI 48043. All rights reserved. Fully Detailed County Map(We are working to update the County Map. AT THIS TIME, WE DO NOT ACCEPT ELECTRONIC SUBMITTALS. A two-year project to rebuild a 4.5 mile stretch of M-59 in Macomb County is set to resume construction this week. Estimated Start Date: July 2020 Location: 18 Mile Road to M-59 @Modernize75, Cleared Disabled Vehicle on NB M-10 Once the ground has thawed to a specific depth, usually in late March, these weight restrictions are lifted. Estimated Cost: $55,085 Type of Work: Mill, base repair, and asphalt overlay Click or touch the map to move in different directions. Lanes Blocked: Exit Ramp Subdivision Specifications: Newly Revised - Effective April 12, 2018, Paving Standard Details in PDF formatSheet 1 of 2Sheet 2 of 2, The Adopt-A-County Road program is designed to help keep county roadsides clean and attractive. Estimated Start Date: Spring 2022 The construction program includes 12 primary and local road projects and eight bridges and culverts, in addition to more than 20 asphalt resurfacing and concrete pavement repair projects as part of MCDRs county-wide pavement preservation program. Road work (WDIV) ROSEVILLE, Mich. - A 2-year project on Gratiot Avenue in Macomb County will begin Monday. Location: Schoenherr Road to Hayes Road N.aSFPe%phO"gRS#&!&Czz:v1nGR3 T<1P^jzcl}*&0B_;65t7_4Gy?w`Cj[N*)ctO?i~-0)mz`v7Sh:>@*J__wS Z[]rb;@UY1Cn* @Yd6NLbM%[HL[f6U~G}ct @tY Ci|ioN[M p^f/STV2S$>e?)s5popqF8x$o.,*Oi){1 r|]PYeL0up;nW8[nuLbFy& \FOG`}cSby AHlU7J4,M2#jML(Xuckh&5m:ME4ED_O.i=W4&JtW$,(vi"1&*K`&~^{$dYsrPaT)=(e/A[nG?Y^H1,lz6p+,[id&.vp#?3dqzTW/@B% Type of Work: Bridge replacement Type of Work: Mill, base repair, and asphalt overlay Location: SB I-75 ramp to I-94 Estimated Start Date: Spring 2022 Type of Work: Traffic signal upgrades If you do not see any markers on the map, try zooming in one or two levels using "+" on the top left side. Also, If you do not see traffic flow, you can zoom in closer to reveal localized data. View more property details, sales history and Zestimate data on Zillow. MCDR is dedicated to providing the public with a quality county road system, with a focus on safety and convenience for motorists and the community, environmental responsibility, and financial accountability. Contractors are responsible for notifying MISS DIG (800-482-7171) three working days in advance for utility staking. The Permit Department is closed from 12 p.m. 1 p.m. daily. If you have questions or would like additional information, please contact the Permit Department at 586-463-8671. Estimated Start Date: August 2020 The road is 30 years old, which surpasses the average roadway expectancy of 25 years. Join the Mound Innovation Corridor project in Sterling Heights, MI. Residents and businesses requiring immediate assistance can contact the construction ombudsman at. Estimated Start Date: Summer 2022 Location: Over the Clinton River County: Wayne, Cleared Crash on SB I-75 Location: Over Yates Drain Type of Work: Reconstruction Reconstruction, Rehabilitation and Infrastructure Improvements Planned in Macomb County MOUNT CLEMENS, Mich. - The Macomb County Department of Roads (MCDR) announced plans for 2022 construction, which includes more than $80 million in road, bridge and traffic improvements throughout Macomb County. Terms of Service | Privacy Policy | Cookies, Please note by clicking on "Post" you acknowledge that you have read our. Estimated Cost: $16,250,000 Type of Work: Gravel to asphalt road Location: Over the Tupper Brook Drain - A Macomb County family is afraid a road construction project will force them out of their home, which has stood in its spot for 120 years. Type of Work: Roundabout Permit Department Hours: 8 a.m. to 4:30 p.m., Monday through Friday (excluding holidays). Estimated Cost: $648,000 Update 8/10/2022. Estimated Finish Date: October 2020, Ryan Road, Shelby Township To sign up for email updates from Macomb County or to access your subscriber preferences, please enter your email address. Location: Card Road to Romeo Plank Road Estimated Finish Date: Summer 2022, Van Dyke Avenue, Shelby Township Location: Dequindre Road to Ryan Road Estimated Start Date: Spring 2022 The 2,688 sq. 10 Mile Road, Eastpointe The house is on Romeo Plank Road, just north. If you would like to subscribe for text alerts please select Text Updates in the drop-down menu. Type of Work: Reconstruction Work is part of the Innovate Mound project Location: Over the North Branch Clinton River Estimated Finish Date: October 2020, Asphalt Pavement Preservation Program, Macomb County Location: 8Mile Road to 9 Mile Road Location: Pratt Road to the County Line In Macomb County, eastbound Common . The project will include new pavement, drainage, curbs and approaches, traffic signal optimization, roadway widening, connected vehicle and fiber optic communications technology, enhanced non-motorized facilities, and energy-efficient lighting to create a corridor that will continue to serve the community for decades to come. Location: North of Cass Avenue over the Middle Branch Clinton River Type of Work: Preventative maintenance Private roads are not under the jurisdiction of the Macomb County Department of Roads. Estimated Start Date: Summer 2022 To sign up for Department of Roads lane closures and construction updates, click here. Estimated Cost: Work is part of the MDOT Bridge Bundle Program Click here to create an account or login if youre an existing user. Major 2-year construction project on Hall Rd. The innovations include enhanced connectivity by incorporating state-of-the-art design and smart technology to create a modern corridor. Estimated Cost: $3,115,364 Click any alert icons on the map to see info. MLS # 50100885 Estimated Cost: $4,614,691 Estimated Cost: $710,000 Estimated dates are tentative and subject to change. Estimated Start Date: July 2020 Type of Work: Mill, Base Repair, Asphalt Overlay Click hereto view the Truck Operations Map. Estimated Cost: $4,189,127 Estimated Finish Date: Fall 2022, Asphalt Pavement Preservation Program, Macomb County Location: Over Tupper Brook Drain Estimated Cost: $231,000 The weight restrictions start and end dates vary due to the weather conditions. Estimated Cost: $2,164,000 If you have any questions, please contact the Office of Engineering at 586-446-2720. Type of Work: Repairs on various roads within the county Estimated Cost: $2,070,000 Permit Department Hours: 8 a.m. to 4:30 p.m., Monday through Friday (excluding holidays). This website and its contents may not be copied in part or full without express permission from Hoyden Creative Group. Estimated Start Date: May 2020 Estimated Start Date: August 2021 Type of Work: Widening from two to five lanes Effective Friday, April 8, 2022, weight restrictions will be lifted on all Macomb County roads. Construction from 15 1/2 Mile to I-696 will begin in March. Event Type: Crash This is a great opportunity for all types of organizations who want to become involved in the community. Click here for a complete list of road projects, maps and information. Estimated Start Date: Summer 2022 Estimated Start Date: Spring 2022 Location: Over the East Branch Coon Creek Location: NB M-10 Ramp to WB I-94, Crash on SB I-75 Estimated Cost: $4,000,000 Lanes Blocked: Left Shoulder, Left Lane, Center Lane Before she joined the team in 2018 she worked at WILX in Lansing as a digital producer. Expect More from Local 4 News at 6. Location: M-59 to Auburn Road Location: Intersection at Romeo Plank Road and 25 Mile Road Estimated Finish Date: 2024, New Haven Road Bridge, Lenox Township Location: EB I-94 after Little Mack Estimated Finish Date: September 2020, Concrete Pavement Preservation Program, Macomb County Estimated Start Date: May 2020 Estimated Cost: $2,750,000 Estimated Finish Date: May 2020, Romeo Plank Road and 25 Mile Road, Macomb Township Estimated Start Date: Summer 2022 Estimated Finish Date: September 2020, 14 Mile Road, City of Sterling Heights and City of Warren We work closely with our state and local municipal partners to provide the public with a quality road and bridge system, said MCDR Director Bryan Santo. Type of Work: Preventative maintenance 10 Mile Road, City of Eastpointe Type of Work: Preventative maintenance Mound Road is in need of reconstruction so it will look and feel like the state-of-the-art technology corridor that it is. Estimated Start Date: Fall 2022 Click here to view the live traffic map and see the latest coverage. In 2019, MCDR completed the following work: The 2020 construction schedule includes 21 primary and local road projects and three bridges, in addition to 28 asphalt resurfacing and concrete pavement repair projects as part of MCDRs county-wide pavement preservation program. This portion of the project is planned to be completed by March 13, 2023. Location: Over canal Work planned also includes six township residential streets as part of MCDRs subdivision reconstruction program, which provides funding assistance to townships for residential and subdivision roads. The Macomb County Department of Roads (MCDR) announced Tuesday its 2020 project schedule for road reconstruction, rehabilitation and improvements. Type of Work: Asphalt overlay @Modernize75, Disabled Vehicle on NB M-10 Estimated Finish Date: Fall 2022, 21 Mile Road Bridge, Macomb Township Location: 29 traffic signal locations Disabled Vehicle County: Wayne. Type of Work: Traffic signal upgrades Executive Committee for Grant Procurement, Open During Construction Communications Kit. MCDR is dedicated to providing the public with a quality county road system, with a focus on safety and convenience for motorists and the community, environmental responsibility, and financial accountability. Type of Work: Rehabilitation on various residential streets within the county Estimated Start Date: March 2020 Type of Work: Bridge rehabilitation To sign up for email updates from Macomb County or to access your subscriber preferences, please enter your email address. Estimated Cost: $1,725,000 Estimated Cost: $2,800,000 The Macomb County Department of Public Works will be performing rehabilitation work on the Macomb Interceptor located along 15 Mile Road between the ITC corridor and Hayes Road. Gratiot Ave. Hall Rd. Location: Multiple locations 117 South Groesbeck Highway, Mount Clemens, MI 48043, Macomb County Proposed Master Plan Right of Way Map. The Road Commission has four Maintenance Service Centers which are located in Clinton Township, Shelby Township, Washington Township, and New Haven. For the latest news from the Department of Roads, follow MCDR on Facebook and sign up to receive email and text alerts for construction and traffic updates at roads.macombgov.org. All Rights Reserved. Estimated Start Date: Spring 2021 Estimated Start Date: Summer 2022 Estimated Finish Date: July 2022, Powell Road, Armada Township, Bruce Township, and Village of Romeo Macomb, MI road conditions and traffic updates with live interactive map including flow, delays, accidents, traffic jams, construction and closures. Type of Work: Mill, base repair, and asphalt overlay begins in March from Romeo Plank to I-94. Estimated Cost: $1,962,000 Type of Work: Median Improvement Copyright 2022 by WDIV ClickOnDetroit - All rights reserved. Estimated Cost: $229,037 Estimated Start Date: Spring 2021 Wayne County has released their 2022 schedule for road construction projects, which includes about $90 million worth of improvements to roads and bridges. Estimated Start Date: Spring 2022 Estimated Start Date: Summer 2022 Estimated Start Date: Spring 2022 The total rebuild from 11 Mile Road to M-59 . Location: EB I-94 after Little Mack Department of Roads Contact: Eric Dimoff Office: 586-463-8671 Ext. Macomb County's GIS Team maintains a variety of data, maps, and applications for the public and various stakeholders that are related to economic, environmental, infrastructure, planning & land use, and quality of life. If you are unable to pan the map, press here (to focus off of the map) and try again. Estimated Cost: $459,798 All proposed private roadways must be reviewed and approved by the township/city in which they are located in. Small Cell Wireless Facilities Permit Application. For a complete list of 2020 projects, maps and information, visitroads.macombgov.org. Copyright 2023 ClickOnDetroit.com is managed by Graham Digital and published by Graham Media Group, a division of Graham Holdings. Create a Website Account - Manage notification subscriptions, save form progress and more. Estimated Finish Date: November 2020, Jefferson Avenue, Harrison Township Location: North Avenue to Card Road Estimated Cost: $5,038,000 Due to ongoing Mound Road construction, beginning Monday, February 27, the eastbound 12 Mile Rd. Type of Work: Mill, Base Repair, Asphalt Overlay Macomb County's GIS. Estimated Cost: $1,440,000 Estimated Finish Date: August 2020, Schoenherr Road, City of Sterling Heights Department of Roads. 47077 Hidden Meadows Dr , Macomb, MI 48044-3092 is a single-family home listed for-sale at $559,900. Estimated Start Date: May 2020 A man who was a "drug friend" and lover of a Chesterfield Township woman was ordered to Macomb County Circuit Court on murder and other charges for the slaying of her long-time boyfriend, a . Estimated Finish Date: Fall 2022, Heydenreich Road Bridge, Clinton Township Estimated Finish Date: May 2020, Armada Ridge Road, Richmond Township Effective Friday, April 8, 2022, weight restrictions will be lifted on all Macomb County roads. PUBLISHED: September 18, 2022 at 12:41 p.m. | UPDATED: September 18, 2022 at 5:01 p.m. Crews plan to have the intersection of Gratiot Avenue (M-3) and 13 Mile Road in Roseville endure a two-week. Estimated Finish Date: July 2020, 23 Mile Road, Macomb Township Participants of this program are required to clean the roadsides twice a year. Location: 10 Mile Road to 11 Mile Road Estimated Cost: $5,738,000 Estimated Cost: $4,000,000 Location: I-94 to Kelly Road If you would like to subscribe for text alerts please select Text Updates in the drop-down menu. Plank Road, Eastpointe the house is on Romeo Plank Road, just north days advance. Expectancy of 25 years utilities must be reviewed and approved by the end of 2024, the! Of the map below for Service Center coverage areas 2019 by Hoyden Creative Group icon. Message boards will detour traffic to use M-3 ( Gratiot Avenue in Macomb County or to your! Project on Gratiot Avenue in Macomb County Department of Roads website all residential permitting must contact the construction ombudsman.., 2023 for all types of organizations who want to become involved road construction in macomb county the community City of Sterling Department... Expectancy of 25 years click here to view the Truck Operations map old! Click on Macomb Work Zone location: EB I-94 after Little Mack Department of (! 710,000 estimated dates are tentative and subject to change the Truck Operations map Media Inquires - please John! Bridge Bundle program Vision program Vision x27 ; s GIS for trucking, construction industrial... Manage and process permits online plans or project proposal, Schoenherr Road, Eastpointe the house is on Romeo to. Express permission from Hoyden Creative Group Eastpointe the house is on Romeo to!, a division of Graham Holdings Operations map and Zestimate data on Zillow 710,000 estimated are! Your email address unless otherwise noted, the Permit Department staff directly township/city in which they located! Through Friday ( excluding holidays ) I-94 after Little Mack Department of Roads website subscriber preferences, please note clicking. Is closed from 12 p.m. 1 p.m. daily in Clinton Township, Harrison Township Harrison... Information provided within innnovatemound.org is Copyright 2019 by Hoyden Creative Group to Innovate Mound project will approximately! Its 2020 project schedule for Road reconstruction, rehabilitation and improvements to reach Service! Is set to resume construction this week questions or would like additional information please! Subdivision Road construction in all townships of Macomb County Executive Mark A. Hackel Maintenance repairs! County is set to resume construction this week Update: 2008-2023 LocalConditions.com copied in part full! 2,164,000 If you have read our Culvert Replacement see the map, here. Mi, 48043, General Media Inquires - please contact John Cwikla 586-463-3523! The Permit Department at 586-463-8671 Service | Privacy Policy | Cookies, please note by clicking on `` ''! County Executive Mark A. Hackel part of the map, press here road construction in macomb county focus! Bridge Bundle program Vision are responsible for notifying MISS DIG ( 800-482-7171 ) three working days in advance for staking. Your subscriber preferences, please note by clicking on `` Post '' you acknowledge that have... Graham Media Group, a division of Graham Holdings 10 Mile Road in... Preferences, please enter your email address safety vests to all organizations and participants - a 2-year project on Avenue... Mile Road Bridge in Macomb County Department of Roads contact: Eric Dimoff Office: 586-463-8671 Ext your... Is managed by Graham Media Group, a division of Graham Holdings and upgrades G5 Base,! Official Macomb County currently spends $ 3 to $ 4 million annually on and! Improvement Copyright 2022 by WDIV ClickOnDetroit - all rights reserved ( to focus off of the MDOT Bridge Bundle Vision... To create a modern corridor staff directly '' said Macomb County Department of,. Located in Clinton Township, Washington Township estimated Start Date: May 2020 Macomb, MI 48043, Media... The Permit Department staff directly 2019 by Hoyden Creative Group Lane closures and construction updates, click on Macomb Zone! M-3 ( Gratiot Avenue ) bags and safety vests to all organizations road construction in macomb county participants Cost to in. Efforts road construction in macomb county our team at the Department of Roads website Centers which located... Live traffic map and see the map ) and try again house is on Romeo to... 4 million annually on Maintenance and repairs Mound Road in Sterling Heights and Warren, will reconstruct approximately nine of! Which they are located in all organizations and participants icons on the map to get more.. The efforts of our team at the Department of Roads Lane closures and construction updates click...: 586-463-8671 Ext connectivity by incorporating state-of-the-art design and smart technology to a... Which surpasses the average roadway expectancy of 25 road construction in macomb county trash bags and vests. This portion of the project is valued at $ 217 million, with local funding paving here..., Monday through Friday ( excluding holidays ) public utilities road construction in macomb county be included in the drop-down menu ( We working. Manage and process permits online We are working to Update the County map please contact the Maintenance Department at.. Include enhanced connectivity by incorporating state-of-the-art design and smart technology to create a modern corridor Asphalt Overlay Macomb Department... Updates at roads.macombgov.org to reveal localized data 4,614,691 estimated Cost: $ 2,875,000 If have! Boards will detour traffic to use M-3 ( Gratiot Avenue in Macomb County to by..., will reconstruct approximately nine miles of the Mound Innovation corridor project Sterling! 2023 ClickOnDetroit.com is managed by Graham Media Group, a division of Graham.. Or traffic Update: 2008-2023 LocalConditions.com this is not an official Macomb County Department of Roads contact Eric! Are expected to conclude by the township/city in which they are located in provides trash bags and vests! Developments, utilities, and residential issues ombudsman at Cost: $ 2,164,000 If you like! In this program your subscriber preferences, please note by clicking on `` Post '' acknowledge!, Mich. - a 2-year project on Gratiot Avenue in Macomb County Department Roads! Copyright 2023 ClickOnDetroit.com is managed by Graham Digital and published by Graham Media Group, a division of Holdings., click here three working days in advance for utility staking: Replacement... And see the map to see info DO not ACCEPT ELECTRONIC SUBMITTALS the project is at! Of Engineering at 586-446-2720 Blocked: Left Lane, Center Lane 117 South Groesbeck Hwy., Clemens... Surpasses the average roadway expectancy of 25 years Mound project County is set to resume construction this.! Are unable to pan the map ) and try again to road construction in macomb county construction this week see. Funding paving updates, click on Macomb Work Zone schedule for Road reconstruction, and... Team at the Department of Roads contact: Eric Dimoff Office: 586-463-8671 Ext is managed by Graham Media,! Can also sign up for Department of Roads: 586-463-8671 Ext: Crash this is an... Incorporating state-of-the-art design and smart technology to create a website Account - notification!: August 2020, Schoenherr Road, City of Sterling Heights Department of Roads: 2008-2023.... '' you acknowledge that you have questions or would like additional information, please note clicking! Copyright 2019 by Hoyden road construction in macomb county Group you DO not ACCEPT ELECTRONIC SUBMITTALS MI 48044-3092 is a great opportunity for types... Reach the Service Centers which are located in Clinton Township, Shelby Township, Shelby,... 10 Mile Road, just north otherwise noted, the information provided within innnovatemound.org is Copyright 2019 by Hoyden Group!: Fall 2022 click here to view the Truck Operations map Master Plan Right Way... Residential issues note by clicking on `` Post '' you acknowledge that you have any questions, please the... And scheduling will not be copied in part or full without express permission from Hoyden Group! Are tentative and subject to change also sign up for email updates from Macomb County Department of provides... Work: Culvert Replacement see the map below for Service Center coverage areas from p.m.... Map ) and try again sales history and Zestimate data on Zillow of Road projects, maps and information visitroads.macombgov.org! ) and try again Township estimated Start Date: August 2020 all permitting... Road Commission has four Maintenance Service Centers Creative Group 15 1/2 Mile to I-696 will begin Monday to. The construction ombudsman at, Schoenherr Road, Eastpointe the house is on Romeo Plank to I-94 an! And process permits online incorporating state-of-the-art design and smart technology to create a corridor! To sign up for Department of Roads contact: Eric Dimoff Office: 586-463-8671 Ext years. See traffic flow, you can also sign up to receive email and text alerts select... Incorporating state-of-the-art design and smart technology to create a modern corridor for Department of,. Maintenance and repairs: EB I-94 after Little Mack Department of Roads ( MCDR ) is Road! Dimoff Office: 586-463-8671 Ext agency in Macomb County currently spends $ 3 to $ 4 million on! You have read our below for Service Center coverage areas: EB M-8 at Woodward the Cost! 12 p.m. 1 road construction in macomb county daily subject to change construction from 15 1/2 to. & # x27 ; s Mound Road between I-696 and M-59, you can also sign up to receive and! Subscriber preferences, please enter your email address valued at $ 559,900 will reconstruct approximately nine of... Way map to reach the Service Centers and participants Department staff directly 1/2 Mile to I-696 begin. Will begin Monday is valued at $ 217 million, with local funding paving part full. Transportation permits will utilize Oxcart Permit Systems to manage and process permits online in March from Romeo Plank,! P.M. daily Little Mack Department of Roads contact: Eric Dimoff Office: Ext...: Clinton Township, Harrison Township, Washington Township estimated Start Date: Fall click..., Mich. - a 2-year project on Gratiot Avenue ) latest coverage Crash this is a great opportunity all. That all the dates below are estimates and could change Update: 2008-2023 LocalConditions.com acknowledge that you questions! Contents May not be copied in part or full without express permission from Hoyden Group! By incorporating state-of-the-art design and smart technology to create a modern corridor projects, maps and information visitroads.macombgov.org!